FEM ANALYTIKA LAB
Instrumentation-Chemistry-Microbiology-Biotechnology Lab
Monday, 23 February 2015
Work Instruction
Operation, Calibration and Maintenance of ICP-OES
Agilent Technology
Lab Code
Version No.: 01
Effective Date:
Review Date:
Supersedes: None
Author(s):
Technical Approver
Authorized By
Name
Designation
Signature
Date
1.
Scope
This work instruction describes procedure for the Operation, Calibration and Maintenance of ICP-OES and this work instruction is applicable to ICP-OES’s (xxx/ICP-OES/01), (Make: Agilent Technologies, Configuration: Hydrostatic pump, Nebulizer , Plasma, Auto sampler, Detector(CID), Exhaust system and Gas controlling system located in instrumentation section of Analytical Lab.
2.
Procedure
2.1.
Operation
2.1.1.
Open the argon gas and adjust the line pressure is 6 bars.
2.1.2.
Switch on the Exhaust, instrument and computer.
Instrument Purging
2.1.3.
Left the Instrument for purging more than 2 hours.
Initialization of Instrument
2.1.4.
Double click on Analyst2 control centre.
2.1.5.
Select the user name is admin and press ok.
2.1.6.
Wait for the initializing instrument to be complete.......
=====================Read More======>>>>>>>
Newer Post
Older Post
Home
About Me
Unknown
View my complete profile